A.
Scope. The policy establishes the procedures to be followed by the San Antonio Water System Customer Service Appeals Committee in the processing of appeals from a decision to terminate service rendered by the Customer Review Officer, as well as for customer disputes concerning high bills, adjustments due to leakage or other matters covered in Sections 34-4.01 and 34-4.03 of the City Code.
The committee will consist of three (3) members appointed by the Board for a two (2) year term, with members able to be removed by the Board. These members shall be customers of SAWS and shall not include any SAWS employees.
The committee is responsible for providing and scheduling a hearing whereby both Customer Service personnel and the customer can discuss the merits of the action under appeal. Hearings will be scheduled within fifteen (15) working days of the receipt of the appeal request. Two (2) committee members shall constitute a quorum for the purpose of conducting any hearing.
Meetings will be scheduled and conducted according to the Open Meetings Act. The conduct and testimony of the hearings shall be recorded and kept with the certified agenda and minutes of the committee meetings as a permanent record.
B.
Appeals. All appeals must be requested in writing by the customer. The following information, at a minimum, must be included in the appeal:
1.
Name of customer;
2.
Service address and/or account number;
3.
Name of representative;
4.
Customer's home and work telephone numbers;
5.
Nature of appeal and resolution desired; and
6.
Customer's signature.
If an appeal is from a decision to terminate rendered by the Customer Review Officer, the customer shall have ten (10) working days from receipt of notice of such decision to request an appeal.
C.
Representation. Customers may represent themselves or may be represented by an attorney or other person of their choosing.
D.
Hearings. This committee shall conduct hearings to consider all information necessary to assist them in deciding on a fair and equitable recommendation to the president/CEO.
E.
Postponements. Postponements, if needed, must be requested in writing and received by the customer service director two (2) full working days prior to the scheduled hearing. The first request for a postponement shall usually be approved. A subsequent request for a postponement shall require justification and is subject to being denied. Postponements must be rescheduled no later than five (5) working days from the previously scheduled hearing.
F.
Failure to Appear. Failure to appear at a scheduled hearing shall subject a customer/representative to forfeit the right to such hearing and the customer/representative shall be required to make an original application in order to be heard. A customer/representative shall be allowed to make only two original applications for appeal on the same subject during any twelve (12) month period.
G.
Recommendation to the president/CEO. At the conclusion of each hearing, the Customer Service Appeals Committee shall announce its recommendation and the reasons for said recommendation to all parties. The secretary of the committee shall transcribe the recommendation and all justification to be forwarded to the president/CEO. The decision of the president/CEO will be final.
(Ord. No. 80330, 6-16-94)
SCHEDULE "A"
CHILLED WATER SERVICE RATE SCHEDULE FOR KELLYUSA
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective May 1, 2005
Billings for chilled water service shall be produced on a monthly basis and shall consist of both a capacity charge and a commodity charge as follows.
CAPACITY CHARGE
The capacity charge shall be $20.52 per ton hour of demand. The demand shall be the largest number of tons of cooling demanded in any of the twelve months ending with the month next preceding the month in which the bill is dated or the demand amount specified in the contract or agreement with the customer, whichever is the greater of the two.
COMMODITY CHARGE
A commodity charge will be applied to the monthly metered consumption. The commodity charge will provide for the pass-through of the Utility Costs, including water and energy costs. No commodity charge shall be made if the metered use of the customer is zero (0) during the month.
The commodity charge will be computed as follows: all utility costs of the previous month will be recovered through an allocation to the consumption of the billing period. In addition, the Payment to the City's General Fund and to GKDA will be added where applicable.
Utility Costs + Payment to General Fund + Payment to GKDA = Commodity Charge Consumption
ADJUSTMENT FOR PAYMENT TO THE CITY GENERAL FUND AND TO GKDA
The City of San Antonio may change the Percentage for payment to the City General Fund pursuant to City Ordinance No. 75686, which is currently established at 2.7% of Gross Revenues. At that time, the commodity and capacity charge will be revised to include the new Percentage of Payment to the City of San Antonio.
The San Antonio Water System has contracted with GKDA to pay 5% on all Chilled Water and Steam service revenues at Kelly USA unless the revenue is derived from services to the USAF on both the realigned portion of Kelly AFB and for the long-term leased-back facilities on the non-realigned portion of Kelly AFB, except for sales to the USAF that are billed to GKDA in connection with multi-tenant buildings in which USAF is one of the tenants.
DEFINITIONS
A ton is defined as 12,000 Btu's per hour.
An hour is defined as 60 consecutive minutes.
Gross revenue is defined in City Ordinance No. 75686.
(Ord. No. 96793, § 1(Att. 1), 11-21-02; Ord. No. 100588, § 1(Att. I), 3-24-05)
SCHEDULE "B"
STEAM SERVICE RATE SCHEDULE FOR KELLYUSA
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective May 1, 2005
Billings for steam service shall be produced on a monthly basis and shall consist of both a capacity charge and a commodity charge as follows:
CAPACITY CHARGE
The capacity charge shall be $95.06 per 100 pounds per hour of demand. The demand shall be the largest number of pounds of steam demanded in any hour of the twelve months ending with the month next preceding the month in which the bill is dated or the demand amount specified in the contract or agreement with the customer, whichever is the greater of the two.
COMMODITY CHARGE
A commodity charge will be applied to the monthly metered consumption. The commodity charge will provide for the pass-through of the Utility Costs, including water and energy costs. No commodity charge shall be made if the metered use of the customer is zero (0) during the month.
The commodity charge will be computed as follows: all utility costs of the previous month will be recovered through an allocation to the consumption of the billing period. In addition, the Payment to the City's General Fund and to GKDA will be added where applicable.
Utility Costs + Payment to General Fund + Payment to GKDA = Commodity Charge Consumption
ADJUSTMENT FOR PAYMENT TO THE CITY GENERAL FUND AND TO GKDA
The City of San Antonio may change the Percentage for payment to the City General Fund pursuant to City Ordinance No. 75686, which is currently established at 2.7% of Gross Revenues. At that time, the commodity and capacity charge will be revised to include the new Percentage of Payment to the City of San Antonio.
The San Antonio Water System has contracted with GKDA to pay 5% on all Chilled Water and Steam service revenues at Kelly USA unless the revenue is derived from services to the USAF on both the realigned portion of Kelly AFB and for the long-term leased-back facilities on the non-realigned portion of Kelly AFB, except for sales to the USAF that are billed to GKDA in
DEFINITIONS
An hour is defined as 60 consecutive minutes.
Gross revenue is defined in City Ordinance No. 75686.
(Ord. No. 96793, § 1(Att. 1), 11-21-02; Ord. No. 100588, § 1(Att. I), 3-24-05)
SCHEDULE "A"
CHILLED WATER SERVICE RATE SCHEDULE FOR DOWNTOWN AREA
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective December 1, 2002
Billings for chilled water service shall be produced on a monthly basis and shall consist of both a capacity charge and a commodity charge as follows.
CAPACITY CHARGE
The capacity charge shall be $18.40 per ton hour of demand. The demand shall be the largest number of tons of cooling demanded in any of the twelve months ending with the month next preceding the month in which the bill is dated or the connected load specified in the contract with the customer, whichever is the greater of the two.
COMMODITY CHARGE
A commodity charge will be applied to the monthly metered consumption. The commodity charge will provide for the pass-through of the utility costs, including water and energy costs. No commodity charge shall be made if the metered use of the customer is zero (0) during the month.
The commodity charge will be computed as follows; all utility costs of the previous month will be recovered through an allocation to the consumption of the billing period. In addition, the payment to the city's general fund will be added where applicable.
Utility costs + Payment to general fund = Commodity charge consumption
ADJUSTMENT FOR PAYMENT TO THE CITY GENERAL FUND
The City of San Antonio may change the percentage for payment to the city general fund pursuant to City Ordinance No. 75686,which is currently established at 2.7% of gross revenues. At that time, the commodity and capacity charge will be revised to include the new percentage of payment to the City of San Antonio.
DEFINITIONS
A ton is defined as 12,000 Btu's per hour.
An hour is defined as 60 consecutive minutes.
Gross Revenue is defined in City Ordinance No. 75686.
(Ord. No. 96794, § 1(Att. 1), 11-21-02)
SCHEDULE "B"
STEAM SERVICE RATE SCHEDULE FOR DOWNTOWN AREA
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective December 1, 2002
Billings for steam service shall be produced on a monthly basis and shall consist of both a capacity charge and a commodity charge as follows:
CAPACITY CHARGE
The capacity charge shall be $88.42 per 100 pounds per hour of demand. The demand shall be the largest number of pounds of steam demanded in any hour of the twelve months ending with the month next preceding the month in which the bill is dated or the connected load specified in the contract with the customer, whichever is the greater of the two.
COMMODITY CHARGE
A commodity charge will be applied to the monthly metered consumption. The commodity charge will provide for the pass-through of the utility costs, including water and energy costs. No commodity charge shall be made if the metered use of the customer is zero (0) during the month.
The commodity charge will be computed as follows; all utility costs of the previous month will be recovered through an allocation to the consumption of the billing period. In addition, the payment to the city's general fund will be added where applicable.
Utility costs + Payment to general fund = Commodity charge consumption
ADJUSTMENT FOR PAYMENT TO THE CITY GENERAL FUND
The City of San Antonio may change the percentage for payment to the city general fund pursuant to City Ordinance No. 75686,which is currently established at 2.7% of gross revenues. At that time, the commodity and capacity charge will be revised to include the new percentage of payment to the City of San Antonio.
DEFINITIONS
An hour is defined as 60 consecutive minutes.
(Ord. No. 96794, § 1(Att. 1), 11-21-02)
SCHEDULE "C"
CHILLED WATER SERVICE RATE SCHEDULE FOR DOWNTOWN AREA
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective December 1, 2002
Rates under this schedule have been developed in accordance with the Stadium Chilled Water Facility Contract passed and approved by the City of San Antonio, VIA Metropolitan Transit, and the San Antonio Water System in May 1991. Billing for chilled water service shall be produced on a monthly basis and shall consist of both a capacity charge and a commodity charge as follows.
SPECIAL CAPACITY CHARGE
The capacity charge shall be $11.40 per ton hour of demand. The demand shall be the largest number of tons of cooling demanded in any of the twelve months ending with the month next preceding the month in which the bill is dated or the connected load specified in the contract with the customer, whichever is the greater of the two.
COMMODITY CHARGE
A commodity charge will be applied to the monthly metered consumption. The commodity charge will provide for the pass-through of the utility costs, including water and energy costs. No commodity charge shall be made if the metered use of the customer is zero (0) during the month.
The commodity charge will be computed as follows; all utility costs of the previous month will be recovered through an allocation to the consumption of the billing period. In addition, the payment to the city's general fund will be added where applicable.
Utility costs + Payment to general fund = Commodity charge consumption
ADJUSTMENT FOR PAYMENT TO THE CITY GENERAL FUND
The City of San Antonio may change the percentage for payment to the city general fund pursuant to City Ordinance No. 75686,which is currently established at 2.7% of gross revenues. At that time, the commodity and capacity charge will be revised to include the new percentage of payment to the City of San Antonio.
DEFINITIONS
A ton is defined as 12,000 Btu's per hour.
An hour is defined as 60 consecutive minutes.
(Ord. No. 96794, § 1(Att. 1), 11-21-02)
SCHEDULE A
RESIDENTIAL CLASS WATER AND SEWER RATE SCHEDULES
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective January 1, 2006
The Service Availability Charge (minimum bill) for all residential water service INSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons of water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size |
Service Availability Charge |
| ⅝" | $6.56 |
| ¾" | 8.32 |
| 1" | 12.10 |
| 1-½" | 21.56 |
| 2" | 32.90 |
| 3" | 59.37 |
| 4" | 97.19 |
| 6" | 191.75 |
| 8" | 305.19 |
| 10" | 437.57 |
| 12" | 815.76 |
MONTHLY VOLUME CHARGE
| Rate Per 100 Gallons | ||
| Usage Blocks | Standard | Seasonal |
| First 7,481 | $0.0878 | $0.0878 |
| Next 5,236 | 0.1268 | 0.1379 |
| Next 4,488 | 0.1994 | 0.2148 |
| Over 17,205 | 0.3186 | 0.4114 |
The Volume Charge "Seasonal" Rate Per 100 Gallons shall be applied to all billings beginning July 1 and ending on or about October 31 of each year. At all other times the Volume Charge "Standard" Rate Per 100 Gallons shall be utilized.
The Service Availability Charge (minimum bill) for all residential water service OUTSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size |
Service Availability Charge |
| ⅝" | $8.51 |
| ¾" | 10.81 |
| 1" | 15.73 |
| 1-½" | 28.02 |
| 2" | 42.77 |
| 3" | 77.18 |
| 4" | 126.35 |
| 6" | 249.26 |
| 8" | 396.75 |
| 10" | 568.83 |
| 12" | 1,060.48 |
MONTHLY VOLUME CHARGE
| Rate Per 100 Gallons | ||
| Usage Blocks | Standard | Seasonal |
| First 7,481 | $0.1140 | $0.1140 |
| Next 5,236 | 0.1649 | 0.1793 |
| Next 4,488 | 0.2591 | 0.2793 |
| Over 17,205 | 0.4141 | 0.5348 |
The Volume Charge "Seasonal" Rate Per 100 Gallons shall be applied to all billings beginning July 1 and ending on or about October 31 of each year. At all other times the Volume Charge "Standard" Rate Per 100 Gallons shall be utilized.
SEWER
Sewer service charges for all metered residential connections are computed on the basis of average water usage for 90 days during three consecutive billing periods beginning after November 15 and ending on or about March 15 of each year and are billed according to the rate schedules below.
INSIDE CITY LIMITS (ICL)
Monthly Service Availability Charge (includes first 1,496 gallons) - $7.37
Over 1,496 gallons - $0.1953 per 100 gallons.
Customers who do not have a record of winter water usage or an interim average will be billed an Unaveraged or Unmetered Residential Charge of $20.52 per month.
OUTSIDE CITY LIMITS (OCL)
Monthly Service Availability Charge (includes first 1,496 gallons) - $8.85
Over 1,496 gallons - $0.2343 per 100 gallons.
Customers who do not have a record of winter water usage or an interim average will be billed an Unaveraged or Unmetered Residential Charge of $24.62 per month.
(Ord. No. 98843, Att. I, 2-12-04; Ord. No. 99994, § 2(Att. I), 11-18-04; Ord. No. 99995, § 2(Att. I), 11-18-04; Ord. No. 101681, § 3(Att. I), 11-17-05; Ord. No. 101682, § 1(Att. I), 11-17-05)
SCHEDULE B
GENERAL CLASS WATER AND SEWER RATE SCHEDULES
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective January 1, 2006
The Service Availability Charge (minimum bill) for all general water service INSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size |
Service Availability Charge |
| ⅝" | $9.51 |
| ¾" | 12.75 |
| 1" | 18.61 |
| 1-½" | 33.94 |
| 2" | 51.19 |
| 3" | 103.60 |
| 4" | 170.93 |
| 6" | 339.18 |
| 8" | 526.36 |
| 10" | 732.45 |
| 12" | 1,154.89 |
MONTHLY VOLUME CHARGE
| Usage Blocks |
Rate per 100 Gallons |
| Below Base* | $0.1052 |
| 100-125% of Base | 0.1218 |
| 125-150% of Base | 0.1582 |
| 150-200% of Base | 0.2072 |
| Over 200% of Base | 0.3062 |
| *The Base Use is defined as 90% of the Annual Average Consumption | |
The Service Availability Charge (minimum bill) for all general water service OUTSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size |
Service Availability Charge |
| ⅝" | $11.46 |
| ¾" | 15.23 |
| 1" | 22.23 |
| 1-½" | 40.40 |
| 2" | 61.06 |
| 3" | 121.42 |
| 4" | 200.08 |
| 6" | 396.70 |
| 8" | 617.92 |
| 10" | 863.71 |
| 12" | 1,399.62 |
| Usage Blocks |
Rate Per 100 Gallons |
| Below Base* | $0.1366 |
| 100-125% of Base | 0.1584 |
| 125-150% of Base | 0.2055 |
| 150-200% of Base | 0.2692 |
| Over 200% of Base | 0.3982 |
| *The Base Use is defined as 90% of the Annual Average Consumption | |
SEWER
Sewer service charges are computed from the water usage schedules below for all metered connections.
INSIDE CITY LIMITS (ICL)
Monthly Service Availability Charge (includes first 1,496 gallons): $7.37
Over 1,496 gallons: $0.1953 per 100 gallons.
OUTSIDE CITY LIMITS (OCL)
Monthly Service Availability Charge (includes first 1,496 gallons): $8.85
Over 1,496 gallons: $0.2343 per 100 gallons.
(Ord. No. 98843, Att. I, 2-12-04; Ord. No. 99994, § 2(Att. I), 11-18-04; Ord. No. 99995, § 2(Att. I), 11-18-04; Ord. No. 101681, § 3(Att. I), 11-17-05; Ord. No. 101682, § 1(Att. I), 11-17-05)
SCHEDULE C
WHOLESALE CLASS WATER AND SEWER RATE SCHEDULES
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective January 1, 2006
The Service Availability Charge (minimum bill) for all wholesale water service INSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size† |
Service Availability Charge |
| 6" | $191.75 |
| 8" | 305.19 |
| 10" | 437.57 |
| 12" | 815.76 |
| † Wholesale water service will not be provided through a meter smaller than 6" in order to comply with fire-flow requirements and the "Criteria for Water Supply and Distribution in the City of San Antonio and its Extraterritorial Jurisdiction." | |
MONTHLY VOLUME CHARGE
| Usage Blocks |
Rate Per 100 Gallons |
| Below Base* | $0.0764 |
| 100-125% of Base | 0.0953 |
| 125-150% of Base | 0.1311 |
| 150-200% of Base | 0.1748 |
| Over 200% of Base | 0.2292 |
| *The Base Use is defined as 90% of the Annual Average Consumption. | |
The Service Availability Charge (minimum bill) for all wholesale water service OUTSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size† | Service Availability Charge |
| 6" | $249.26 |
| 8" | 396.75 |
| 10" | 568.83 |
| 12" | 1,060.48 |
| † Wholesale water service will not be provided through a meter smaller than 6" in order to comply with fire-flow requirements and the "Criteria for Water Supply and Distribution in the City of San Antonio and its Extraterritorial Jurisdiction." | |
MONTHLY VOLUME CHARGE
| Usage Blocks |
Rate Per 100 Gallons |
| Below Base* | $0.0993 |
| 100-125% of Base | 0.1239 |
| 125-150% of Base | 0.1705 |
| 150-200% of Base | 0.2273 |
| Over 200% of Base | 0.2980 |
| *The Base Use is defined as 90% of the Annual Average Consumption | |
SEWER
INSIDE CITY LIMITS (ICL)
$0.1760 Monthly Volume Charge per 100 gallons of contributed wastewater. ($1.32 per 100 cubic feet)
OUTSIDE CITY LIMITS (OCL)
$86.50 Monthly Service Availability Charge plus $0.2113 Monthly Volume Charge per 100 gallons of contributed wastewater. ($1.59 per 100 cubic feet)
(Ord. No. 98843, Att. I, 2-12-04; Ord. No. 99994, § 2(Att. I), 11-18-04; Ord. No. 99995, § 2(Att. I), 11-18-04; Ord. No. 101681, § 3(Att. I), 11-17-05; Ord. No. 101682, § 1(Att. I), 11-17-05)
SCHEDULE D
IRRIGATION CLASS WATER AND SEWER RATE SCHEDULES
SAN ANTONIO WATER SYSTEM
San Antonio, Texas
Effective January 1, 2006
The Service Availability Charge (minimum bill) for all irrigation water service INSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size |
Service Availability Charge |
| ⅝" | $9.51 |
| ¾" | 12.75 |
| 1" | 18.61 |
| 1-½" | 33.94 |
| 2" | 51.19 |
| 3" | 103.60 |
| 4" | 170.93 |
| 6" | 339.18 |
| 8" | 526.36 |
| 10" | 732.45 |
| 12" | 1,154.89 |
MONTHLY VOLUME CHARGE
| Usage Blocks |
Rate Per 100 Gallons |
| First 12,717 | $0.1479 |
| Next 4,488 | 0.2219 |
| Over 17,205 | 0.3062 |
The Service Availability Charge (minimum bill) for all irrigation water service OUTSIDE THE CITY LIMITS of San Antonio furnished through meters of the following sizes together with the Monthly Volume Charge measured per 100 gallons for water usage in every instance of service for each month or fraction thereof shall be as follows:
MONTHLY SERVICE AVAILABILITY CHARGE
| Meter Size |
Service Availability Charge |
| ⅝" | $11.46 |
| ¾" | 15.23 |
| 1" | 22.23 |
| 1-½" | 40.40 |
| 2" | 61.06 |
| 3" | 121.42 |
| 4" | 200.08 |
| 6" | 396.70 |
| 8" | 617.92 |
| 10" | 863.71 |
| 12" | 1,399.62 |
MONTHLY VOLUME CHARGE
| Usage Blocks |
Rate Per 100 Gallons |
| First 12,717 | $0.1921 |
| Next 4,488 | 0.2884 |
| Over 17,205 | 0.3982 |
(Ord. No. 98843, Att. I, 3-12-04; Ord. No. 99994, § 2(Att. I), 11-18-04; Ord. No. 101681, § 3(Att. I), 11-17-05)
SCHEDULE E
INDUSTRIAL WASTE FEE SCHEDULE
(Under Article V, Sewage Transportation, Treatment and Disposal, Division 3, Sec. 34-484, et seq.)
Effective 12:01 a.m., January ___, 2008
Ordinance No. ______ dated December 6, 2007
| Name of Fee |
Fee Amount |
Unit |
| Industrial Waste Discharge Permit—Categorical | $6,000.00 | Per Five (5) Year Permit with annual pro rata payments |
| Industrial Waste Discharge Permit—Non-Categorical | $4,500.00 | Per Five (5) Year Permit with annual pro rata payments |
| Sampling Fee—Significant Industrial Users | $400.00 | Per sample of discharge from Significant Industrial User collected under Industrial Pre-Treatment Program |
| Sampling Fee—Non-Significant Industrial Users | $3.84 | Per month billed to Non-Significant Industrial User under Industrial Pre-Treatment Program |
| Laboratory Testing Fees: | ||
| Alkalinity | $15.00 | Per test |
| Ammonia Direct | $17.50 | Per test |
| Ammonia Distillation | $35.00 | Per test |
| Biochemical Oxygen Demand | $30.00 | Per test |
| Chemical Oxygen Demand | $31.25 | Per test |
| Conductivity | $10.00 | Per test |
| Cyanide—Total (with Post Amending) | $40.25 | Per test |
| Phosphorus—Total | $22.38 | Per test |
| Total Kjeldahl Nitrogen | $33.75 | Per test |
| Total Dissolved Solids | $13.50 | Per test |
| Total Suspended Solids | $16.00 | Per test |
| Turbidity | $12.86 | Per test |
| Escherichia Coli—Present/Absent | $19.00 | Per test |
| Total Coliform—Present/Absent | $18.00 | Per test |
| Fecal Coliform | $18.00 | Per test |
| Fecal Streptococcus | $25.00 | Per test |
| Escherichia Coli—Membrane Filtration | $18.00 | Per test |
| Mercury | $30.00 | Per test |
| Hardness | $16.00 | Per test |
| Hexavalent Chromium | $28.75 | Per test |
| Metals | $14.00 | Per test |
| Fats, Oil and Grease | $55.00 | Per test |
| IC (Nitrite, Sulfate, Chloride, Nitrite/Nitrate Combined, Nitrate, Fluoride) | $15.54 | Per test |
| Organochlorine Pesticides | $170.00 | Per test |
| Organophosphorus Pesticides (8 compounds) | $194.75 | Per test |
| Semi-Volatile Organic Compounds (70—110 compounds) | $375.00 | Per test |
| Total Petroleum Hydrocarbons | $100.00 | Per test |
| Volatile Organic Compounds—Drinking Water (48—84 compounds) | $112.50 | Per test |
| Volatile Organic Compounds—Waste Water (31 compounds) | $151.25 | Per test |
(Ord. No. 2007-12-13-1345, § 2(Att. B), 12-13-07)
SCHEDULE F
LIQUID WASTE HAULER FEE SCHEDULE
(Under Article V, Sewage Transportation, Treatment and Disposal, Division 4, Sec. 34-521, et seq.)
Effective 12:01 a.m., January ___, 2008
Ordinance No. ______ dated December 6, 2007
| Name of Fee |
Fee Amount |
Unit |
| Liquid Waste Permits and Coupons—Truck Permit | $246.00 | Per annual permit per liquid waste hauling truck |
| Liquid Waste Permits and Coupons—Manifest Coupon Books | $10.00 | Per manifest book |
(Ord. No. 2007-12-13-1345, § 2(Att. B), 12-13-07)