15.04.200 - Reference to Article I.
15.04.220 - Existing Electrical Systems.
15.04.225 - Alternate Materials and Methods of Construction.
15.04.240 - Powers and Duties of the Building Official.
15.04.245 - General standards, appeals, violations.
15.04.250 - Application for Permit.
15.04.265 - Expiration of permit application or issued permit.
15.04.275 - Connection Approval.
15.04.200 - Reference to Article I.
Refer to Article I - General Administrative Amendments of this chapter.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
These regulations shall be known as the "Oakland Amendments Of The California Electrical Code," may be cited as such, and will be referred to herein as "this chapter," "this Code," or "the Oakland Building Construction Code."
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
A.
The purpose of this Code is to provide minimum standards to safeguard life or limb, property and public welfare by regulating and controlling the design, construction, installation, quality of materials, location, operation, maintenance and use of electrical systems, equipment, machinery, fixtures, and appliances within this jurisdiction.
B.
The purpose of this Code is not to create or otherwise establish or designate any particular class or group of people who will or should be especially protected or benefited by the terms of this Code.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
A.
The provisions of this Code shall apply to the installation, alteration, repair, relocation, replacement, addition, use, or maintenance of electrical systems, equipment, machinery, fixtures and appliances. Additions, alterations, repairs and replacement of electrical systems or equipment shall comply with the provisions for new equipment and systems.
B.
Where, in any specific case, different sections of this Code specify different materials, methods of construction or other requirements, the most restrictive shall govern. When there is a conflict between a general requirement and a specific requirement, the specific requirement shall be applicable.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.220 - Existing Electrical Systems.
A.
Additions, alterations, replacements, or repairs may be made to any electrical system without requiring existing electrical system to comply with all the requirements of this Code, provided the addition, alteration, replacement, or repair conform to the requirements for a new electrical system or equipment. Additions, alterations, replacements, or repairs shall not cause an existing system to become dangerous, hazardous, or otherwise unsafe.
B.
Electrical systems and equipment lawfully in existence at the time of the adoption of this Code may have their use, maintenance or repair continued if the use, maintenance or repair is in accordance with the original design and location and no hazard to life or limb, property, or public welfare has been created by such electrical system.
C.
Electrical systems and equipment which are a part of any building or structure undergoing a change in use or occupancy, as defined in the California Building Code, shall comply will all requirements of this Code which may be applicable to the new use or occupancy.
D.
All electrical systems, equipment, materials and appurtenances, both existing and new, and all parts thereof shall be maintained in proper operating condition. All devices or safeguards which are required by this Code shall be maintained in conformance with the code edition under which installed. The property owner or designated agent shall be responsible for maintenance of electrical systems and equipment. To determine compliance with this subsection, the Building Official may cause an electrical system or equipment to be inspected.
E.
Electrical systems or equipment which are a part of buildings or structures moved into or within this jurisdiction shall comply with the provisions of this Code for new installations.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.225 - Alternate Materials and Methods of Construction.
A.
The provisions of this Code are not intended to prevent the use of any material or method of construction not specifically prescribed by this Code provided any such alternate has been approved and the use authorized by the Building Official.
B.
The Building Official may authorize may alternate, provided the Building Official finds the proposed design is satisfactory for the intended use and complies with the provisions of this Code and that the material, method or work offered is for the purpose intended, at least equivalent to that prescribed by this Code in suitability, strength, effectiveness, fire resistivity, durability, ampacity, and safety.
C.
The Building Official shall require sufficient evidence or proof be submitted to substantiate claims made regarding the use of alternates. The details of any approval actions for an alternate shall be retained by the Building Official for the period required for retention of public records.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
Whenever there are practical difficulties involved in carrying out the provisions of this Code, the Building Official may grant modifications for individual cases. The Building Official shall first find that a special individual reason makes the strict letter of this Code impractical and the modification does not lessen health life and fire safety requirements. The details of actions granting modifications shall be recorded and shall be retained by the Building Official for the period required for retention of public records.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
Whenever there is insufficient evidence of compliance with the provisions of this Code, or evidence that a material or method does not conform to the requirements of this Code or in order to substantiate claims for alternate materials or methods, the Building Official may require tests as evidence of compliance to be made at no expense to the jurisdiction. Test methods shall be as specified in this Code or by other recognized test standards. In the absence of recognized and accepted test methods, the Building Official shall specify the testing procedures. All tests shall be performed by an approved agency. Reports of tests shall be retained by the Building Official for the period required for retention of public records.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.240 - Powers and Duties of the Building Official.
A.
The Building Official is authorized and directed to enforce all the provisions of this Code. For such purposes, the Building Official shall have the powers of a law enforcement officer. The Building Official shall have the power to render interpretations of this Code and to adopt and enforce rules and regulations supplemental to this Code as may be deemed necessary in order to clarify the application of the provisions of this Code. Such interpretations, rules and regulations shall conform with the intent and purpose of this Code.
B.
In accordance with the prescribed procedures and with the approval of the appointing authority, the Building Official may appoint such number of technical officers, inspectors, other employees, or agents as shall be authorized from time to time. The Building Official may deputize such inspectors or employees as may be necessary to carry out the functions of the Code Enforcement Agency.
C.
When it is necessary to make an inspection to enforce the provisions of this Code, or when the Building Official has reasonable case to believe that there exists in a building or upon a premises a condition which is contrary to or in violation of this Code which makes the building or premises unsafe, hazardous, or dangerous, the Building Official may enter the building or premises at reasonable times to inspect or to perform the duties imposed by this Code, provided that if such building or premises be occupied that credentials be presented to the occupant and entry requested. If such building or premises be unoccupied and unsecured, the Building Official shall first make a reasonable effort to locate the property owner or other person having charge or control of the building or premises and request entry. If entry is refused, the Building Official shall have recourse to the remedies provided by law to secure entry.
D.
When any work is being done contrary to the provisions of this Code, the Building Official may order the work stopped by notice in writing served on any persons engaged in the doing or causing such work to be done and such persons shall forthwith stop work until authorized by the Building Official to proceed with the work.
E.
The Building Official shall have the authority to disconnect electrical utility service or energy supplies to a building, structure, premises, or equipment regulated by this Code in case of emergency where necessary to eliminate an immediate hazard to life or limb, property, or public welfare. The Building Official shall, whenever possible, notify the serving utility, the property owner and occupant of the building, structure or premises of the decision to disconnect prior to taking such action, and shall notify such serving utility, property owner and occupant for the building, structure or premises in writing of such disconnection immediately thereafter.
F.
When the Building Official determines that any equipment, or portion thereof, regulated by this Code has become unsafe, hazardous, or dangerous to life or limb, property, or public welfare, the Building Official shall order in writing that the equipment either be removed or restored to a safe condition, as appropriate, within a fixed time. Persons shall not use or maintain defective equipment after receiving a notice. When an electrical system or equipment is to be disconnected, written notice indicating the causes therefore shall be given within 24 hours to the serving utility, the property owner and occupant of the building, structure or premises. When any electrical equipment or system is maintained in violation of this Code, and in violation of a notice issued as provided in this section, the Building Official shall institute an appropriate action to prevent, restrain, correct or abate the violation.
G.
Persons shall not make connections from an energy or power supply nor supply energy or power to any equipment regulated by this Code which has been disconnected or ordered to be disconnected by the Building Official or the use of which has been ordered to be discontinued by the Building Official until the Building Official authorizes the reconnection and use of such equipment.
H.
The Building Official or his or her authorized representative, charged with the enforcement of this Code, acting in good faith and without malice in the discharge of the duties required by this Code or other pertinent law or ordinance shall not thereby be rendered personally liable for damages that may accrue to persons or property as a result of an act or by reason of an act or omission in the discharge of such duties. A suit brought against the Building Official or another employee, representative, official, officer, agent, or volunteer of the City of Oakland because of such act or omission performed by the Building Official or another employee, representative, official, officer, agent, or volunteer of the City of Oakland in the enforcement of any provision of such codes or other pertinent laws or ordinances implemented through the enforcement of this Code or enforced by the Code Enforcement Agency shall be defended by this jurisdiction until final termination of such proceedings, and any judgment resulting there from shall be assumed by the City of Oakland.
This Code shall not be construed to relieve from or lessen the responsibility of any person owning, operating or controlling any electrical system or equipment regulated herein for damages to persons or property caused by defects, nor shall the Code Enforcement Agency or the City of Oakland be held as assuming any such liability by reason of the inspections authorized by this Code or any permits or certificates issued under this Code.
I.
The Building Official may request, and shall receive the assistance and cooperation of other officials of this jurisdiction so far as is required in the discharge of the duties required by this Code or other pertinent law or ordinance.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.245 - General standards, appeals, violations.
A.
General Standards. Refer to Section 15.04.015 of this chapter.
B.
Appeals. Refer to Section 15.04.025 of this chapter.
C.
Violations. Refer to Section 15.04.030 of this chapter.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.250 - Application for Permit.
A.
Refer to Section 15.04.035 of this chapter.
B.
Except as permitted in subsection C of this section, no electrical system or equipment regulated by this Code shall be installed, altered, repaired, replaced or remodeled unless a separate electrical permit or "Combination Permit" has been obtained from the Building Official for each separate building or structure.
C.
Refer to National Electrical Code (NEC) Article 90-2(a).
D.
Exemption from the permit requirements of this Code shall not be deemed to grant authorization for work to be done in violation of the provisions of this Code or other laws or ordinances of this jurisdiction.
E.
A plant permit may be issued by the Building Official to a person not holding a California State Electrical Contractor License but who is regularly employed as an electrician in a plant or business. The permit shall be issued upon written application from the owner or manager of the plant or business in which the person is employed. The application shall certify that the proposed permittee is competent to perform the electrical work and shall certify that all work will be performed under the requirements of this chapter.
All electrical work shall be done under the direction and supervision of the permittee. All electrical work, excepting the maintenance and repair of existing electrical installation and repair, shall be done only under permits issued as otherwise required under this article. The owner or manager of any plant or business employing the permittee shall immediately notify the Building Official in writing upon termination of the permittee and such notification shall cancel the plant permit.
Evidence of any electrical work being done under the plant permit that is in violation of any provisions of this chapter shall be grounds for immediate suspension or cancellation of the permit by the Building Official. The plant permit is renewable on an annual basis from the date of issuance for a fee established by the master fee schedule.
F.
A meter reset permit shall be issued by the Building Official to any person for the purpose of reconnecting a supply of service or reinstalling a meter whenever the serving utility shall disconnect electrical service supply or remove any electrical meter to a structure or building for a period of 90 days or more in a residential occupancy or 30 days or more in a commercial or industrial occupancy. An inspection of the occupancy and other pertinent facilities is required. The serving utility will be authorized by the Building Official to reconnect the supply of service or reinstall any meter upon the condition that the occupancy is found to be void of hazardous or unsafe conditions.
Any hazardous or unsafe conditions found will require that an electrical permit (or combination permit) be obtained, as elsewhere contained in this chapter, to correct those same conditions. The meter reset permit does not cover electrical work as elsewhere contained in this chapter. Meter reset permit fee is established by the master fee schedule.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
A.
Information on Submittals. Refer to Section 15.04.040 of this chapter.
B.
Signing and Sealing of Plans and Other Submittal Documents. Refer to Section 15.04.045 of this chapter.
C.
Persons Who May Prepare Plans. Refer to Section 15.04.050 of this chapter.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
A.
The application, plans, diagrams, calculations, specifications, computations and other data filed by an applicant for permit shall be reviewed by the Building Official. Such data may be reviewed by other departments of this and other jurisdictions to verify compliance with applicable laws under their jurisdiction. When the Building Official finds that the work described in an application for a permit and the plans, diagrams, computations, calculations, specifications and other data filed therewith conform to the requirements of this Code and other pertinent laws, ordinances and conditions of compliance for the abatement of violations of this Code and other codes and ordinances and that the fees, charges, costs and assessments specified in the master fee schedule, as well as all penalties, have been paid, the Building Official shall issue a permit therefore to the applicant.
When issuing a permit where plans are required, the Building Official shall endorse in writing or stamp the plans as provided in the California Building Code. Such approved plans shall not be changed, modified or altered without authorization from the Building Official, and all work regulated by this Code shall be done in accordance with the approved plans.
The Building Official may issue a permit for the construction of a part of an electrical system before the entire plans and specifications for the whole system have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements of this Code. The holder of a partial permit may proceed without assurance that the permit for the entire building, structure or electrical system will be granted.
B.
One set of reviewed plans, diagrams, calculations, specifications and computations shall be retained by the Building Official until final approval of the work covered therein. One set of approved plans and specifications shall be returned to the applicant, and said set shall be kept on the site of the building or work at all times during which the work authorized thereby is in progress.
C.
The issuance of a permit or approval of plans, calculations, specifications, diagrams, and computations shall not be construed to be a permit for, or an approval of any violation of any of the provisions of this Code or of other ordinances, rules, or regulations of the jurisdiction. Permits presuming to give authority to violate or cancel the provisions of this Code or of other ordinances, rules, or regulations of the jurisdiction shall not be valid.
The issuance of a permit based upon plans, calculations, specifications, computations and other data shall not prevent the Building Official from thereafter requiring the correction of errors in said plans, calculations, computations, specifications, and other data or from preventing building operations being carried on there under when in violation of this Code or of other ordinances of this jurisdiction.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.265 - Expiration of permit application or issued permit.
A.
Expiration of Permit Application or Issued Permit. Refer to Section 15.04.055 of this chapter.
B.
Suspension or Revocation of Issued Permit. Refer to Section 15.04.060 of this chapter.
C.
Fees. Refer to Section 15.04.065 of this chapter.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
A.
Electrical equipment and systems for which permits are required by this Code shall be subject to inspection by the Building Official and such electrical equipment and systems shall remain accessible and exposed for inspection purposes until approved by the Building Official. It shall be the duty of the permit applicant to cause the electrical equipment and systems to remain accessible and exposed for inspection purposes. Neither the Building Official nor the City of Oakland shall be liable for expense entailed in the removal or replacement of any material required to permit inspection. When the installation of an electrical system or equipment is complete, an additional and final inspection shall be made. Electrical systems and equipment regulated by this Code shall not be connected to the energy supply lines until authorized by the Building Official.
Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this Code or of other ordinances, rules, or regulations of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this Code or of other ordinances of the City of Oakland shall not be valid.
B.
The requirements of this section shall not be considered to prohibit the operation of mechanical systems installed to replace existing equipment or fixtures serving an occupied portion of the building in the event a request for inspection of such equipment or fixture has been filed with the Building Official not more than 48 hours after such replacement work is completed, and before any portion of such electrical system is concealed by any permanent portion of the building.
C.
It shall be the duty of the person doing the work authorized by a permit to notify the Building Official that such work is ready for inspection. Every request for inspection shall be filed at least one working day before such inspection is desired. Such request may be in writing or by telephone at the option of the Building Official. It shall be the duty of the person requesting inspections required by this Code to provide access to and means for inspection of such work.
D.
In addition to the called inspections required by this Code, the Building Official may make or require other inspections of electrical work to ascertain compliance with the provisions of this Code and other laws which are enforced by the Code Enforcement Agency.
E.
A re-inspection fee may be assessed for each inspection or re-inspection when such portion of work for which inspection is requested is not complete or when required corrections have not been made. This provision is not to be interpreted as requiring re-inspection fees the first time a job is rejected for failure to comply with the requirements of this Code, but as controlling the practice of calling for inspections before the job is ready for inspection or re-inspection.
Re-inspection fees may be assessed, when the approved plans are not readily available to the inspector for failure to provide access on the date for which inspection is requested or for deviating from plans requiring the approval of the Building Official. Re-inspection fees shall be established and assessed in accordance with the master fee schedule ordinance. In instances where re-inspection fees have been assessed, no additional inspection of the work will be performed until the required fees have been paid.
F.
In addition to the inspections identified in this section, the Building Official may allow inspection by others in accordance with Section 15.04.055 of this chapter.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
15.04.275 - Connection Approval.
A.
No person shall make connections from a source of energy to any electrical system or equipment regulated by this Code and for which a permit is required until approved by the Building Official.
B.
Whenever any person engaged in the distribution or sale of electrical energy shall set or install, or reset or reinstall, in, or about any building any meter for the measurement of electrical energy; or shall connect or reconnect supply or service to any installation of electrical equipment in, on, or about any building; or shall change the nominal voltage of supply for service to any installation of electrical equipment, in, on, or about any building; or shall change any such supply for service from two-wire to three-wire or vice versa, or from single phase to polyphase or vice versa, or from direct current to alternating current or vice versa, said person shall receive written authorization from the Building Official or the Building Official's designated representative, which authorization shall specify the location and address of the installation affected, provided, however, that said authorization need not be received with respect to any such meter installation or reinstallation or any such supply or service connection or reconnection, authorized by the Building Official or the Building Official's designated representative within 30 days or more in residential occupancies or 90 days or more in other occupancies of previous authorization; provided further that the Building Official may, at his or her discretion, waive temporarily or permanently any or all requirements of this section by giving written notice of such waiver to all persons engaged in the distribution or sale of electrical energy; and said Building Official may likewise at any time revoke such waiver by written notice to all such persons.
C.
The Building Official may authorize temporary connection of the electrical equipment to the source of energy for the purpose of testing the equipment, or for use under a temporary certificate of occupancy.
D.
Provisions shall not be made for installing more than a single utility meter in the service equipment for a single-family dwelling, including other structures on the same property, without written authorization by the Building Official prior to their installation.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
In Article 100 - Part A of the California Electrical Code, add the following definitions:
A.
Multiple Family Dwelling. Occupancies shall include Group R, Division 2 and Group I, Division 2, as defined and used in the California Building Code.
B.
Family Room. A room or area in a dwelling unit separate from and contiguous to a kitchen and not used for eating, sleeping or sanitation purposes.
C.
Recreation Room. Refer to Family Room.
D.
Show Window. Applicability shall further include all occupancies engaged in public commerce, including banking and real estate.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)
In Article 110 of the California Electrical Code, add the following new article:
Article 110-35 SAFETY
Electrical equipment and systems shall be constructed, installed, operated, and maintained safely and potentially free from electrical shock or fire hazard.
(Ord. No. 13047, §§ 2, 3, 11-9-2010)